Welcome to Renqiu WanHe Motorcycle Parts Co.,LTDWebsite!

Renqiu WanHe Motorcycle Parts Co.,LTD

Mobile: 13403177888

Contact

Renqiu WanHe Motorcycle
 Parts Co.,LTD
Tel:0317-2805888
Mobile:13403177888
Address:Renqiu 
City, Hebei Province, China
Website:www.wanhemopei.com/English

How to adjust the continuous carburizing furnace for motorcycle chain wheel?

View:336 Update:2019-09-16 
Preparation before start-up: the new furnace or repaired equipment must be started after acceptance, and the following preparations shall be made. The electrician shall check whether the electrical equipment is normal, each current circuit breaker shall be in the off position, and the manual cycle reset switch shall be in the off position. The fitter shall check whether the furnace door, front and rear soft chain, main push rod, material tray, transmission mechanism, quenching table and fan lamp are in normal operation, and whether the lubrication points are normal. Check and clean the air intake pipe by plumber. Check whether the instrument and oxygen tube are under normal protection.

返回顶部